How to save a troubled project: A case study of transitioning to Takt Time at project closeout – Rines

2:30 pm -3:15 pm

Thursday, April 20, 2023

Benjamin Banneker

Abstract:

Takt time is a planning tool, with careful attention to balancing workflow, for setting up a project to complete on time. How do you shift the culture of a project from full-on production to closeout to stop the bleeding of time? This paper will explore the challenges of implementing a paradigm-shifting workforce management plan in the closeout phase when the project was executed with poor original planning and an incomplete critical path method schedule. This paper will address the multiple lessons learned from the practical application of executing a collaborative endeavor involving owner, contractor and subcontractors to switch everyone’s thinking from push to pull planning.

PMI Talent Triangle: Technical Project Management (Ways of Working)